A second coat may be necessary but be sure to allow 24 hours before applying it.
Problems with epoxy in basement floor.
When an epoxy coating fails it doesn t offer the protection and durability that usually comes along with this type of flooring.
The epoxy is softer than the usual way even after curing in the right temperature and time see 3 7 8 and 11.
Make sure the floor is at least 60 degrees for a minimum of.
This is the most common cause for epoxy floor failures and or bad finishes.
Treated or sealed concrete.
After all it requires more than just cleaning the concrete thoroughly.
A cold surface can also.
Common problems and diagnosis.
It can also hurt the physical performance properties of the epoxy.
Remove the taped plastic and assess the nature of wetness.
The epoxyshield garage floor coating boasts a powerful two part epoxy formula.
Epoxy floor coating is one of the best garage flooring options on the market for its durability beautiful shine and low level of maintenance.
Wait until the epoxy has fully dried before installing a new floor.
If the concrete patch that was sealed is completely dry and the rest of the floor is wet it is an indication of a sweating floor caused by humid air outside but if the patch is wet and the rest of the floor dry it is an indication of a moisture problem.
Epoxy cures in the preparation bucket before the actual application see 1a and 2.
Unlike traditional latex paints the epoxyshield concrete floor paint is proven to resist wear and tear.
To test pour water over the bare concrete.
However if applied incorrectly you can experience problems with your garage floor.
Cause adhesion issues with your project.
Epoxyshield works well on a variety of rugged concrete floors including garage workshop and basement floors.
The epoxy peels off the surface so easily even after curing process see number 10.
The most common problem with epoxy coatings is small pinhead size bubbles may appear sporadically over the floor or in honeycomb clusters.
A lot of time when doing an epoxy garage floor coating for the first time people underestimate how important is to prepare the concrete properly.
Sealants curing agents concrete hardeners and other treatments to the concrete will interfere with the bonding of the epoxy.
Any previous coatings should be ground off using a diamond grinder.
Be sure to apply the epoxy to a cool basement floor which will help it to adhere to the surface.
2 days prior to application.
Use a long handled roller to apply the epoxy in a thin coat.